Skip to main content
AngesenANGESEN®
Case Studies
Residential

Mass Residential Apartment Fit-Out

Dubai, UAE202412,000 m²

Challenge

1,200 apartment units requiring uniform quality, fast delivery, zero callbacks. Desert climate with extreme temperature swings required material stability at 50°C+.

Angesen Solution

Angesen 12mm standard boards supplied in container loads direct to Dubai. Local teams trained in 1 day. Products passed 70°C / 48h dimensional stability test (≤0.5%).

Results

  • 1,200 units in 3 months
  • Zero callbacks
  • Material waste <2% (vs 8-12% for cement)
  • 100% reorder from developer